Dollar Rent-A-Car Facilities Move

When timing means everything!  

MSI Project Case Study:  Dollar Rent-A-Car Facilities Move at T. F. Green Airport, RI.

Dollar Rent-A-Car was moving its rental car installation from the airport terminal to the new Intermodal Facility at the T.F Green Airport at Providence International Airport. This move included the functions provided at an off-site rental car returns area. MSI was engaged to design and build the Voice & Data infrastructure required in the new facility as well as manage the move. The Rhode Island Airport Commission issued a mandate stating the specific date and time of the move to the new facility.

MSI senior engineers and project managers met regularly with construction management personnel to determine building requirements and schedules. Due to the physical aspect and the logistical requirements of the new building, the existing phone system would not be moved to the new facility. MSI engineers designed a compliant fiber optic and copper cable plant, designed, selected and sourced all infrastructure components including the VoIP solution, routers, switches, fiber optic equipment, PCs, Terminals, and Servers. In addition the design included a WiFi solution for hand-held terminals. MSI also supplied a complete bill of materials for the entire installation.

MSI completed all required design drawings and submitted them on time, negotiated and managed the cable plant installation by a subcontractor, designed, selected, configured, installed, and tested all infrastructure components for the VoIP, internal data LAN, and Internet at the new location. MSI also defined the “Dial Plan” and coordinated the “cut-over” and “turn-up” of all voice, data, & Internet services in the narrowly defined timing window without a hitch.

 


An optimized network works better and costs less, much less!  Optimize your telecommunications today and gain maximum savings and performance!

Call MSI at 617-302-6741 Today!